
あなたを合格させるC-IBP-2211お手軽に試験合格リアルC-IBP-2211練習問題集で更新されたのは2023年04月29日
2023年最新の実際に出ると確認されたで無料SAP C-IBP-2211試験問題
質問 20
You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.
- A. You must mark the realignment step as "shared" and assign the steps to users.
- B. The number of steps in the realignment run is limited to 255.
- C. A realignment step can change master data, planning objects and key figures.
- D. The name of the realignment step should be no longer than 20 characters.
正解: A,C
質問 21
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?
- A. IF("PERIODID2" ="$$PERIODID2CU$$...)
- B. IF("PERIODID4" ="$$PERIODID4CU$$...)
- C. IF("PERIODID3" ="$$PERIODID3CU$$...)
- D. IF("PERIODID5" ="$$PERIODID5CU$$...)
正解: B
質問 22
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.
- A. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
- B. Lag-based snapshots are created in the Configuration app for a fixed time range.
- C. Target key figures for these snapshots are exposed to the user in planning views.
- D. The number of lag-based snapshots are limited to nine levels.
正解: A,B
質問 23
Which type of Master Data will be represented by the Master Data Type LOCATIONFR?
- A. Compound Master Data Type
- B. External Master Data Type
- C. Virtual Master Data Type
- D. Reference Master Data Type
正解: D
質問 24
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.
- A. Specify a planning horizon in the planning area for each level of the assigned time profile.
- B. Configure at least one calculated key figure for the planning area.
- C. Configure at most two input key figures on the same planning level in a key figure calculation.
- D. Assign the compound master data type and its component master data types.
正解: A,D
質問 25
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.
- A. Fixing is possible for a certain period, including all child values in the hierarchy.
- B. Fixing is possible for a certain quantity of a key figure value.
- C. Fixing is possible for system editable key figures.
- D. Fixing is possible for manually editable key figures.
正解: A,C
質問 26
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are
3 correct answers to this question.
- A. Keep the number of fairshare segments small.
- B. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
- C. Split into multiple planning areas to support weekly vs. daily planning needs.
- D. Avoid using telescopic time buckets.
- E. Increase the use of incremental lot size beyond the frozen horizon.
正解: B,C,D
質問 27
You are configuring disaggregation for the KF1 key figure in the Planning Areas Model Configuration app.Which methods can you use?Note: There are 3 correct answers to this question.
- A. Disaggregation according to a helper key figure
- B. Disaggregation according to a user-defined expression
- C. Disaggregation according to an equal split
- D. Disaggregation in batch triggered by an application job
- E. Proportional disaggregation by using KF2 in the expression
正解: B,C,E
質問 28
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.
- A. Consideration of demand-driven analysis for buffer positioning.
- B. Detailed statistical analysis of demand data using predictive analytics tools
- C. Demand sensing of demand data using predictive analytics tools
- D. Embedded, on-the-fly demand analytics
正解: A,D
質問 29
You are implementing SAP IBP to plan for a supply chain that experiences high seasonality.What supply planning operators can be used in your model to plan stock pre-builds?
- A. Supply optimizer and supply heuristics
- B. Supply optimizer only
- C. Finite and infinite heuristics
- D. Finite heuristics only
正解: A
質問 30
Which parts of the S&OP high-level process would the Inventory planning and optimization process fit into?Note: There are 2 correct answers to this question.
- A. Management business Review, by providing the inventory targets for endorsement
- B. Demand Review, by using the output of demand planning as input into calculations
- C. Reconciliation Review, by providing inventory parameters for one consolidated plan
- D. Supply Review, by providing an input to supply network planning
正解: B,D
質問 31
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note:
There are 2 correct answers to this question.
- A. Splitting the values from detailed to aggregated level by using a copy operator
- B. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
- C. Splitting the values from aggregated to detailed level, based on the time profile attribute
- D. Splitting the values from aggregated to detailed level using multiplication by the proportions
正解: B,D
質問 32
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.
- A. Demand Sensing
- B. Demand Driven Replenishment
- C. Response Planning
- D. Inventory Optimization
- E. Sales and Operations Planning
正解: A,D,E
質問 33
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?
- A. Capacity expansion with additional costs
- B. Production source validity at the start of seasonal peak
- C. Adjusted production interactive values
- D. Incremental production values
正解: A
質問 34
You set up time-series integration using Cloud Integration for Data Services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with status "Fatal Error". How can you find more details about the error?
- A. Navigate to the Manage Master Data app and open the Log.
- B. Download the Initial Problem Report in the Data Integration app.
- C. Navigate to the Master Data Workbook in Excel and open the Log.
- D. Download the Rejection Report in the Data Integration app.
正解: A
質問 35
Which pre-processing steps can be used to cleanse historical sales data before generating a statistical forecast in SAP IBP?Note: There are 2 correct answers to this question.
- A. Bias Detection and Correction in Sales History
- B. Substitute Missing with Mean or Median in Sales History
- C. Intermittency Detection and Correction in Sales History
- D. Promotion Sales Lift Elimination
正解: B,D
質問 36
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note:
There are 2 correct answers to this question.
- A. If necessary target key figures values are disaggregated.
- B. Copying multiple key figures on different planning levels is not possible.
- C. If necessary source key figures values are disaggregated.
- D. Copying multiple key figures can be processed sequentially.
正解: A,D
質問 37
Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.
- A. A unit of measure key figure, such as UOMCONVERSIONFACTOR
- B. A currency conversion key figure, such as exchange rate
- C. A special key figure marked as an aggregate key figure (aggregate constraint)
- D. A forecast metric key figure, such FCSTMAPE
正解: A,C
質問 38
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.
- A. Real-time Integration
- B. Cloud Identity Authentication Service
- C. Smart Data Integration
- D. Cloud Integration for Data Services
正解: C,D
質問 39
......
C-IBP-2211リアル試験問題解答は無料:https://www.passtest.jp/SAP/C-IBP-2211-shiken.html
C-IBP-2211試験問題、リアルC-IBP-2211練習問題集:https://drive.google.com/open?id=1mjf1z8zaC-CfccbhTVzp1ptWAKrCLSZ-