Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.
- A. Keep the number of fairshare segments small.
- B. Increase the use of incremental lot size beyond the frozen horizon.
- C. Split into multiple planning areas to support weekly vs. daily planning needs.
- D. Avoid using telescopic time buckets.
- E. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
正解:C、D、E
質問 # 25
What actions can be performed in the Advanced Dashboards application?Note: There are 3 correct answers to this question.
- A. Use drill-down functionality.
- B. Add process templates.
- C. Display all assigned analytics on a single UI.
- D. Rename the charts.
- E. Link two analytics charts.
正解:A、B、C
質問 # 26
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.
- A. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
- B. Planning results can be generated faster by the optimizer.
- C. Push and Pull production models are used by the optimizer.
- D. Finite heuristics can achieve demand prioritization and pegging.
正解:C、D
質問 # 27
Which pre-processing steps can be used to cleanse historical sales data before generating a statistical forecast in SAP IBP?Note: There are 2 correct answers to this question.
- A. Promotion Sales Lift Elimination
- B. Bias Detection and Correction in Sales History
- C. Intermittency Detection and Correction in Sales History
- D. Substitute Missing with Mean or Median in Sales History
正解:A、D
質問 # 28
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes?
Note: There are 2 correct answers to this question.
- A. Demand Sensing with Gradient Boosting (Full)
- B. Charts creation in SAP Supply Chain Control Tower
- C. Supply Heuristics in SAP IBP for sales and operations
- D. Decoupling Points determination in SAP IBP for demand-driven replenishment
正解:A、C
質問 # 29
Time profiles are made out of levels, and levels are made out of periods.Which ways can SAP IBP identify profiles and periods?Note: There are 2 correct answers to this question.
- A. Periods are identified by an alphanumeric prefix and profiles by an integer.
- B. Both periods and profiles have start and end dates.
- C. Periods are identified by an integer and profiles by an alphanumeric prefix.
- D. Both periods and profiles are identified by a unique integer.
正解:A、C
質問 # 30
You want to maintain key figure values for a new attribute and value combination, using SAP IBP, Add-in for Microsoft Excel, and are receiving an error related to missing combinations.How can you resolve this problem?Note: There are 2 correct answers to this question.
- A. Use the Manage Master Data app to create the combinations
- B. Use the option New Planning Object in the SAP IBP, add-in for Microsoft Excel
- C. Use the Check Mode operator to create the combinations
- D. Use the Data Integration app to load suitable data that creates the combinations
正解:A、D
質問 # 31
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.
- A. Configure at most two input key figures on the same planning level in a key figure calculation.
- B. Specify a planning horizon in the planning area for each level of the assigned time profile.
- C. Configure at least one calculated key figure for the planning area.
- D. Assign the compound master data type and its component master data types.
正解:B、D
質問 # 32
What are some of the properties of filter blocks?Note: There are 3 correct answers to this question.
- A. Filter blocks are imposed when modeling attribute transformations.
- B. Filter blocks can be visualized in the Key Figure Calculations app.
- C. Filter blocks are imposed when modeling cross-period calculations.
- D. Filter blocks can be visualized in SAP IBP, add-in for Microsoft Excel
- E. Filter blocks are imposed when modeling an attribute as a key figure.
正解:A、D、E
質問 # 33
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.
- A. Fixing is possible for a certain quantity of a key figure value.
- B. Fixing is possible for a certain period, including all child values in the hierarchy.
- C. Fixing is possible for system editable key figures.
- D. Fixing is possible for manually editable key figures.
正解:B、C
質問 # 34
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?
- A. IF("PERIODID3" ="$$PERIODID3CU$$...)
- B. IF("PERIODID4" ="$$PERIODID4CU$$...)
- C. IF("PERIODID2" ="$$PERIODID2CU$$...)
- D. IF("PERIODID5" ="$$PERIODID5CU$$...)
正解:B
質問 # 35
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note:
There are 2 correct answers to this question.
- A. Copying multiple key figures on different planning levels is not possible.
- B. Copying multiple key figures can be processed sequentially.
- C. If necessary source key figures values are disaggregated.
- D. If necessary target key figures values are disaggregated.
正解:B、D
質問 # 36
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.
- A. Activate Local Member Recognition setting is selected.
- B. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.
- C. Users should have authorization for template administration.
- D. Use Excel Cell References in the Report Editor option is selected.
正解:A、C
質問 # 37
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
- A. Aggregated constraints
- B. Maximum lot size
- C. Adjusted transport receipts
- D. Minimum lot size
- E. Transportation lead times
正解:B、C、E
質問 # 38
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?
- A. Ensure that the outsourced manufacturing locations have a separate subnetwork
- B. Use production lead times and offsets to manage components at the outsourced manufacturing location
- C. Model target inventory and stocks at the outsourced manufacturing location
- D. Model relative production costs across internal locations and outsourced manufacturing locations
正解:D
質問 # 39
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are 2 correct answers to this question.
- A. The key figure is stored and system editable.
- B. The key figure is calculated and system editable.
- C. The key figure is calculated and all editable.
- D. The key figure is stored and all editable.
正解:D
質問 # 40
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.
- A. Target Service Level
- B. Minimum Lot Size
- C. Holding Cost Percentage
- D. Transportation Lead Time Error CV
正解:A、B
質問 # 41
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.
- A. Add a new time profile level to the time profile.
- B. Change the past and future horizon of the levels in the time profile.
- C. Change the description of the attributes in the time profile.
- D. Change the numbering hierarchy of the period IDs in the time profile.
正解:B、C
質問 # 42
What are the outputs of the Calculate Target Inventory Components Operator?Note: There are 3 correct answers to this question.
- A. Target Cycle Stock
- B. Recommended Safety Stock
- C. Reorder Point
- D. Target Pipeline Stock
- E. Component Usage
正解:A、B、D
質問 # 43
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are
2 correct answers to this question.
- A. Multi-Level Supply Planning Heuristics
- B. Time series analysis
- C. Scenario analysis for operational supply planning
- D. Simple statistical forecast
正解:A、D
質問 # 44
You are reviewing the master data types that are often used for supply and inventory planning
.Which master data types are compound master data types?Note: There are 2 correct answers to this question.
- A. SOURCECUSTGROUP
- B. SOURCEPRODUCTION
- C. SOURCELOCATION
- D. SOURCECUSTOMER
正解:C、D
質問 # 45
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?Note: There are 2 correct answers to this question.
- A. The attribute should be a non-key attribute of the master data type.
- B. The attribute belongs to a simple or compound master data type.
- C. The attribute should be assigned to all planning levels.
- D. The Business Meaning of the attribute has been specified.
正解:A、B
質問 # 46
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.
- A. By Number of Items (Sorted Average)
- B. By Pareto Principle (Sorted and Calculated Values)
- C. By Number of Items (Sorted Values)
- D. By Pareto Principle (Sorted and Cumulated %)