質問 # 31
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note:
There are 2 correct answers to this question.
- A. The key figure is stored and all editable.
- B. The key figure is stored and system editable.
- C. The key figure is calculated and all editable.
- D. The key figure is calculated and system editable.
正解:A、B
質問 # 32
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note:
There are 2 correct answers to this question.
- A. Splitting the values from detailed to aggregated level by using a copy operator
- B. Splitting the values from aggregated to detailed level, based on the time profile attribute
- C. Splitting the values from aggregated to detailed level using multiplication by the proportions
- D. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
正解:C、D
質問 # 33
For which of the following application jobs can you enter planning filters as parameters?Note: There are
2 correct answers to this question.
- A. Purge Non-Conforming Data
- B. Purge Key Figure Data
- C. Purge Master Data
- D. Create Time Periods for Time Profiles
正解:B、C
質問 # 34
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.
- A. Increase the use of incremental lot size beyond the frozen horizon.
- B. Keep the number of fairshare segments small.
- C. Avoid using telescopic time buckets.
- D. Split into multiple planning areas to support weekly vs. daily planning needs.
- E. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
正解:C、D、E
質問 # 35
Analytics charts are created by the user in the Advanced Analytics application.What can the user do in the Advanced Analytics app?Note: There are 2 correct answers to this question.
- A. Open graphics in Excel.
- B. Group data.
- C. Merge charts together.
- D. Apply filters on your data.
正解:B、D
質問 # 36
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.
- A. Purge Non-Conforming Data
- B. Purge Key Figure Data
- C. Purge Master Data
- D. Create Time Periods for Time Profiles
正解:B、C
質問 # 37
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?
- A. Model target inventory and stocks at the outsourced manufacturing location
- B. Ensure that the outsourced manufacturing locations have a separate subnetwork
- C. Model relative production costs across internal locations and outsourced manufacturing locations
- D. Use production lead times and offsets to manage components at the outsourced manufacturing location
正解:C
質問 # 38
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to this question.
- A. Charts creation in SAP Supply Chain Control Tower
- B. Supply Heuristics in SAP IBP for sales and operations
- C. Demand Sensing with Gradient Boosting (Full)
- D. Decoupling Points determination in SAP IBP for demand-driven replenishment
正解:B、C
質問 # 39
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.
- A. Fixing is possible for manually editable key figures.
- B. Fixing is possible for system editable key figures.
- C. Fixing is possible for a certain period, including all child values in the hierarchy.
- D. Fixing is possible for a certain quantity of a key figure value.
正解:B、C
質問 # 40
Which of the following are capabilities of the Manage Forecast Error Calculations - Inventory Optimization app?Note: There are 2 correct answers to this question.
- A. Identifiy intermittent demand for Forecast Error CV calculations
- B. Propagate forecast error to upstream locations in a supply chain network
- C. Adjust Safety Stock Recommendations based on forecast error CV input
- D. Adjust for forecast bias in Forecast Error CV calculations
正解:C、D
質問 # 41
Which of the following are valid use cases for using the Realignment App?Note: There are 2 correct answers to this question.
- A. Changing customer sources and reassigning customers to new DCs
- B. Using the realignment run to identify obsolete data
- C. Removing outliers from the sales history of a reference product before transferring its sales to a new product
- D. Merging two locations into a new location
正解:A、D
質問 # 42
For your project, you create a new planning area and consider how to create analytics and alerts for it.How can you create these objects?
- A. Use the option for copying analytics and alerts when creating a new planning area from the sample SAPIBP1.
- B. Merge analytics and alerts into a new planning area from any sample planning area.
- C. Use the option for copying analytics and alerts into the new planning area from the existing custom planning area.
- D. Create analytics and alerts in the new planning area from scratch using the Intelligent Visibility application.
正解:A
質問 # 43
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.
- A. Simulate heuristics run in Supply Review stage
- B. Model inventory turns based on Target Safety stocks
- C. Simulate statistical forecast at the Demand Review stage
- D. Simulate demand sensing inputs for Supply Review
正解:A、C
質問 # 44
What does ABC/XYZ segmentation allow you to do?Note: There are 2 correct answers to this question.
- A. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B".
- B. Choose time-independent key figures as segmentation measures.
- C. Substitute missing values in case of sporadic demands.
- D. Identify inventory items that require closer attention.
正解:B、D
質問 # 45
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.
- A. Lot sizes are time-independent master data settings.
- B. Lot sizes are applicable for production and transportation quantities.
- C. Periodic lot size setting overrides the minimum lot size.
- D. Lot sizes are applicable for production and handling quantities.
正解:A、D
質問 # 46
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.
- A. The number of lag-based snapshots are limited to nine levels.
- B. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
- C. Target key figures for these snapshots are exposed to the user in planning views.
- D. Lag-based snapshots are created in the Configuration app for a fixed time range.
正解:B、D
質問 # 47
You are invited to review a problem with a customer's SAP IBP Excel template performance.What areas with the biggest potential performance impact would you focus on?Note: There are 2 correct answers to this question.
- A. Excessive SAP IBP formatting in the Microsoft Excel UI
- B. Complex calculation graphs for key figures
- C. Number of local members and complexity of calculations
- D. Number of analytics charts displaying key figures' values
正解:A、B