C-IBP-2211問題集と練習テスト(80問題) [Q12-Q36]

Share

(2023)C-IBP-2211問題集と練習テスト(80問題)

ガイド(2023年最新)リアルなSAP C-IBP-2211試験問題

質問 # 12
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.

  • A. Fixing is possible for a certain period, including all child values in the hierarchy.
  • B. Fixing is possible for system editable key figures.
  • C. Fixing is possible for a certain quantity of a key figure value.
  • D. Fixing is possible for manually editable key figures.

正解:A、B


質問 # 13
Which of the following are inputs to Demand Sensing with Gradient Boosting (Full) algorithm?Note:
There are 2 correct answers to this question.

  • A. Future Consensus Forecasts and Lagged Forecast Snapshots
  • B. Recommended Safety Stocks from Multistage Inventory Optimization
  • C. Forecast Error CV Calculated by Manage Forecast Error Calculations app
  • D. Sales Order Quantities (both historical and future open orders)

正解:A、B


質問 # 14
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are
3 correct answers to this question.

  • A. Split into multiple planning areas to support weekly vs. daily planning needs.
  • B. Avoid using telescopic time buckets.
  • C. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
  • D. Keep the number of fairshare segments small.
  • E. Increase the use of incremental lot size beyond the frozen horizon.

正解:A、B、C


質問 # 15
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.

  • A. Users should have authorization for template administration.
  • B. Use Excel Cell References in the Report Editor option is selected.
  • C. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.
  • D. Activate Local Member Recognition setting is selected.

正解:A、D


質問 # 16
What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned?

  • A. Created as type INTEGER and assigned to a compound master data type
  • B. Created as type NVARCHAR and assigned to an external master data type
  • C. Created as type DECIMAL and assigned to a compound master data type
  • D. Created as type INTEGER and assigned to a simple master data type

正解:C


質問 # 17
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.

  • A. Lot sizes are applicable for production and handling quantities.
  • B. Lot sizes are applicable for production and transportation quantities.
  • C. Periodic lot size setting overrides the minimum lot size.
  • D. Lot sizes are time-independent master data settings.

正解:A、D


質問 # 18
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note:
There are 3 correct answers to this question.

  • A. The alerts dashboard is not available if a value-based filter is set for the open planning view.
  • B. You can add (or delete) planning objects to a planning view after these filters are applied.
  • C. These filters can be used together with attribute totals in the same planning view.
  • D. These filters are always applied based on the values stored in the database.
  • E. You can only apply one value-based filter per planning view.

正解:A、D、E


質問 # 19
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.

  • A. Target Service Level
  • B. Minimum Lot Size
  • C. Transportation Lead Time Error CV
  • D. Holding Cost Percentage

正解:A、B


質問 # 20
You are invited to review a problem with a customer's SAP IBP Excel template performance.What areas with the biggest potential performance impact would you focus on?Note: There are 2 correct answers to this question.

  • A. Number of analytics charts displaying key figures' values
  • B. Number of local members and complexity of calculations
  • C. Complex calculation graphs for key figures
  • D. Excessive SAP IBP formatting in the Microsoft Excel UI

正解:C、D


質問 # 21
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.

  • A. Lag-based snapshots are created in the Configuration app for a fixed time range.
  • B. The number of lag-based snapshots are limited to nine levels.
  • C. Target key figures for these snapshots are exposed to the user in planning views.
  • D. Target key figures for these snapshots must have lag as a root attribute in its base planning level.

正解:A、D


質問 # 22
You are working with inventory key figures.What are some of the business scenarios where you can use the Last Period Aggregation function?Note: There are 2 correct answers to this question.

  • A. Calculating the value of inventory on any time profile level ensuring flexibility of calculation
  • B. Calculating how many periods inventory is going to last based on the planned demand
  • C. Search for and return the last not null value of the inventory key figure
  • D. Calculating the value of inventory on a weekly basis, using static aggregation from the daily level

正解:B、C


質問 # 23
Which parts of the S&OP high-level process would the Inventory planning and optimization process fit into?Note: There are 2 correct answers to this question.

  • A. Reconciliation Review, by providing inventory parameters for one consolidated plan
  • B. Demand Review, by using the output of demand planning as input into calculations
  • C. Management business Review, by providing the inventory targets for endorsement
  • D. Supply Review, by providing an input to supply network planning

正解:A、C


質問 # 24
Which of the following are valid use cases for using the Realignment App?Note: There are 2 correct answers to this question.

  • A. Using the realignment run to identify obsolete data
  • B. Merging two locations into a new location
  • C. Removing outliers from the sales history of a reference product before transferring its sales to a new product
  • D. Changing customer sources and reassigning customers to new DCs

正解:B、D


質問 # 25
You define fixing for a key figure.Which of the following functions are available for this key figure? Note:
There are 2 correct answers to this question.

  • A. Fixing is possible for a certain period, including all child values in the hierarchy.
  • B. Fixing is possible for system editable key figures.
  • C. Fixing is possible for a certain quantity of a key figure value.
  • D. Fixing is possible for manually editable key figures.

正解:A、B


質問 # 26
You want to display and edit data in different Units of Measure (UOM).Which of the following must you consider before you use the UOM?Note: There are 3 correct answers to this question.

  • A. Units of measure are usually not time-independent.
  • B. Units of measure are usually not time-dependent.
  • C. Analytics provide the user with the option to select the target unit of measure.
  • D. Conversion to the target unit of measure is handled by SAP IBP Excel UI
  • E. Unit of measure is an attribute of a master data type, such as Product.

正解:B、C、E


質問 # 27
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?

  • A. IF("PERIODID5" ="$$PERIODID5CU$$...)
  • B. IF("PERIODID2" ="$$PERIODID2CU$$...)
  • C. IF("PERIODID4" ="$$PERIODID4CU$$...)
  • D. IF("PERIODID3" ="$$PERIODID3CU$$...)

正解:D


質問 # 28
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Change the numbering hierarchy of the period IDs in the time profile.
  • B. Add a new time profile level to the time profile.
  • C. Change the description of the attributes in the time profile.
  • D. Change the past and future horizon of the levels in the time profile.

正解:C、D


質問 # 29
What are some of the properties of filter blocks?Note: There are 3 correct answers to this question.

  • A. Filter blocks are imposed when modeling attribute transformations.
  • B. Filter blocks are imposed when modeling an attribute as a key figure.
  • C. Filter blocks can be visualized in SAP IBP, add-in for Microsoft Excel
  • D. Filter blocks can be visualized in the Key Figure Calculations app.
  • E. Filter blocks are imposed when modeling cross-period calculations.

正解:A、B、C


質問 # 30
What does ABC/XYZ segmentation allow you to do?Note: There are 2 correct answers to this question.

  • A. Choose time-independent key figures as segmentation measures.
  • B. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B".
  • C. Identify inventory items that require closer attention.
  • D. Substitute missing values in case of sporadic demands.

正解:A、C


質問 # 31
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.

  • A. Trend Chart Types
  • B. Simulation Chart Types
  • C. Seasonal Chart Types
  • D. Geographic Chart Types
  • E. Comparison Chart Types

正解:A、C、E


質問 # 32
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note:
There are 2 correct answers to this question.

  • A. If necessary source key figures values are disaggregated.
  • B. Copying multiple key figures can be processed sequentially.
  • C. Copying multiple key figures on different planning levels is not possible.
  • D. If necessary target key figures values are disaggregated.

正解:B、D


質問 # 33
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

  • A. Maximum lot size
  • B. Transportation lead times
  • C. Aggregated constraints
  • D. Minimum lot size
  • E. Adjusted transport receipts

正解:A、B、E


質問 # 34
What are the relevant use cases for helper key figures?Note: There are 2 correct answers to this questions.

  • A. Used at any level of calculation level except the Request Level
  • B. Used by end-users in planning views to help visualize cross-period calculations
  • C. Used to break down a large calculation into manageable subcalculations
  • D. Used when you have more than three inputs at different planning levels in one calculation

正解:C、D


質問 # 35
Which type of Master Data will be represented by the Master Data Type LOCATIONFR?

  • A. External Master Data Type
  • B. Compound Master Data Type
  • C. Virtual Master Data Type
  • D. Reference Master Data Type

正解:D


質問 # 36
......


SAP IBP for Supply Chainは、リアルタイムのデータ、高度な分析、機械学習機能を提供することで、企業が正しい意思決定を行えるよう支援するクラウドベースのソリューションです。SAP C_IBP_2211の認定を取得することで、個人はこの強力なソリューションを使用して、サプライチェーンプロセスを最適化し、予測精度を向上させ、意思決定を改善する能力を証明することができます。

 

C-IBP-2211試験問題集パスできる2023年最新の認証された試験問題:https://www.passtest.jp/SAP/C-IBP-2211-shiken.html

C-IBP-2211試験問題リアルな最新問題PDF:https://drive.google.com/open?id=1hQpf_dn0R2wbYbPsvC0ZgjXhgD_xGp66