LEED-AP-ND試験問題集でPDF問題とテストエンジン
LEED-AP-ND問題集で必ず試験合格させる
質問 # 30
A mixed-use development includes a 150.00011'' (13.935 m2) office building. Which energy analysis option can be considered under Green Infrastructure and Buildings Prerequisite. Minimum Building Energy Performance for this building?
- A. Prescriptive measures of the ASHRAE Advanced Energy Design Guide for Small to Medium Office Buildings
- B. Performance rating method of ENERGY STAR
- C. Prescriptive measures in the Advanced Buildings Core Performance™ Guide
- D. Performance rating method ANSI/ASHRAE/ESNA Standard 90.1-2010
正解:D
解説:
The Green Infrastructure and Buildings Prerequisite for Minimum Building Energy Performance requires buildings to meet certain energy performance standards. For a mixed-use development that includes a 150,000 ft² (13,935 m²) office building, the performance rating method specified by ANSI/ASHRAE/IESNA Standard
90.1-2010 is the appropriate standard to use. This standardis widely recognized for its stringent energy efficiency criteria and is typically required for projects seeking LEED certification. Other options, like the ENERGY STAR performance rating, are not applicable because they are more commonly used for operational buildings rather than for new construction or major renovations. The prescriptive measures mentioned in the other options are generally used for smaller or simpler buildings.
質問 # 31
In ardor to achieve the Neighborhood Pattern and Design Credit. Visit ability and Universal Design. the owner of a new six-unit residential building has decided to incorporate universal design strategies throughout each home. Which of the following features contributes to mat credit?
- A. Easy-touch rocker or hand-tree switches
- B. Met on sensors on all faucets
- C. Easy-to-reach door knobs
- D. Motion dot tic tor lighting in Bedrooms
正解:A
解説:
For the Neighborhood Pattern and Design Credit on Visitability and Universal Design, incorporating features that enhance accessibility and usability for all individuals, regardless of physical ability, is crucial. Easy-touch rocker or hands-free switches contribute directly to this credit as they make it easier for individuals with physical disabilities, such as limited hand strength or dexterity, to operate lighting and other controls. These features align with the principles of universal design, which aim to make spaces more inclusive. Options like easy-to-reach door knobs or motion sensors, while beneficial, do not directly address the needs of individuals with disabilities as effectively as the easy-touch switches.
質問 # 32
The LEED for Neighborhood DevelopmentRating System considers which ofthe following to be a circulation network?
- A. Spaces dedicated to non-motorized travel for project occupants to use for travel between buildings
- B. Dedicated rights-of-way for fixed-rail transit service
- C. All motorizednon-motorized and mixed-mode travel ways permanently accessible in thepublic
- D. Entrance and exit ways for vehicular use into and out of parking lots or structures
正解:C
解説:
The LEED for Neighborhood Development (LEED ND) Rating System defines a "circulation network" as an interconnected network that includes all travel ways that facilitate the movement of people within a neighborhood. This encompasses motorized, non-motorized, and mixed-mode travel ways that are permanently accessible to the public. The purpose of this network is to ensure a comprehensive and integrated system that supports all modes of transportation, thereby promoting accessibility, safety, and sustainability within the neighborhood. The focus on inclusivity in the definition ensures that all possible methods of transit-whether by foot, bicycle, car, or public transport-are considered part of this network.
質問 # 33
A developer has built a snow storage system that uses snow collected in the winter to cool water that serves the neighborhood central plant during the summer.Which credit will this system contribute to?
- A. Green Infrastructure and Buildings Heal Island Reduction
- B. Green Infrastructure and Buildings. Outdoor Water Use Reduction
- C. Green Infrastructure and Buildings. Renewable Energy Production
- D. Green Infrastructure and Buildings. Optimize Building Energy Performance
正解:D
解説:
A snow storage system that uses collected snow in the winter to cool water for a neighborhood central plant during the summer would contribute to the Green Infrastructure and Buildings credit for Optimizing Building Energy Performance. This innovative system reduces the energy needed for cooling by utilizing natural, renewable resources, thereby enhancing the overall energy efficiency of the development.
* Optimize Building Energy Performance Credit:This credit aims to reduce the energy demand of buildings through design strategies and technologies that improve energy efficiency. By optimizing energy use, projects can significantly lower their environmental impact and operational costs.
* Snow Storage System:The snow storage system in question utilizes a natural process where snow, collected in winter, is stored and then used to cool water for a central plant in summer. This method reduces reliance on traditional, energy-intensive cooling systems such as air conditioning, thereby saving energy.
* Renewable and Efficient Energy Use:This system aligns with the objectives of the Optimize Building Energy Performance credit by reducing the need for mechanical cooling. It is an example of how leveraging local climatic conditions and natural processes can contribute to sustainable building operations.
* The LEED Reference Guide for Neighborhood Development provides guidelines on how innovative energy-saving strategies, like snow storage systems, can be applied to earn points under the Optimize Building Energy Performance credit.
* TheLEED v4 Neighborhood Developmentdocumentation further elaborates on various energy optimization strategies that can be employed to enhance building performance.
Detailed Explanation:References:For additional information, refer to:
* LEED Reference Guide for Neighborhood Development
* LEED v4 Neighborhood Development
These explanations provide a thorough understanding of how specific project features can contribute to earning LEED-ND credits and meeting sustainability goals.
質問 # 34
A project builds a central plant that burns biomass products to provide space heating and hot water to the development. Which ofthe following Green Infrastructure and Buildings credits could this help the project achieve?
- A. Solar Orientation
- B. indoor Water Use Reduction
- C. Infrastructure Energy Efficiency
- D. District Heating and Cooling
正解:D
解説:
The development of a central plant that burns biomass products to provide space heating and hot water is directly aligned with the Green Infrastructure and Buildings Credit for District Heating and Cooling. This credit rewards projects that implement district energy systems that use renewable energy sources, such as biomass, to provide heating and cooling to multiple buildings in a development. By using biomass, the project reduces reliance on fossil fuels, lowersgreenhouse gas emissions, and increases energy efficiency, all of which are key objectives of this credit.
References:
* LEED v4 Neighborhood Development Guide: This document details the requirements for achieving the District Heating and Cooling credit, including the use of renewable energy sources like biomass (USGBC, LEED v4 Neighborhood Development Current Version).
* LEED Reference Guide for Neighborhood Development: This guide provides a comprehensive overview of how district energy systems can contribute to credit achievement, specifically focusing on the sustainability benefits of biomass and other renewable energy sources (USGBC, LEED Reference Guide for Neighborhood Development).
* USGBC Official Website: The website provides information on the Green Infrastructure and Buildings credits, including District Heating and Cooling, and highlights the advantages of using renewable energy in central plants (USGBC, LEED for Neighborhood Development Rating System).
質問 # 35
A mixed-use development's total building area is 1.742.400 ft1 (161 874 m2) with 350 planned dwelling units Within a 1/2 mi. (08 km) walking distance are 20 diverse uses totaling 550.000 ft2 (51 096 m2) and 375 full- time jobs.
To achieve Smart Location and Linkage Credit. Housing and Jobs Proximity, what is the minimum areaof the residential component ofthe project?
- A.

- B.

- C.

- D.

正解:B
質問 # 36
A project site is located in a Federal Empowerment Zone What Is also needed to qualify the protect tor Smart Location and Linkage Credit. Preferred Locations Option 3: Designated High-Priority Locations?
- A. Provide 10% of total rental units priced up to 60% area median income (AMI)
- B. Use no more than 20% of the total development footprint area for off-street surface parking, with no individual surface parking lot larger than two acres (0.8 hectare)
- C. Locate the project on an adjacent site that is also a previously disturbed site
- D. Locate the project such that 50% of its dwelling units are within a 1/4 ml.(0.4 km) walking distance of at least seven diverse uses
正解:A
解説:
For a project located in a Federal Empowerment Zone to qualify for the Smart Location and Linkage Credit under Preferred Locations Option 3: Designated High-Priority Locations, the project must also meet certain affordability criteria. Specifically, providing at least 10% of total rental units priced at or below 60% of the area median income (AMI) aligns with the requirements for achieving this credit. This ensures that the development supports affordable housing in addition to being located in a high-priority area.
References:
* LEED v4 Neighborhood Development Guide: Details the requirements for Designated High-Priority Locations, including the criteria related to affordable housing (USGBC, LEED v4 Neighborhood Development Current Version).
* LEED Reference Guide for Neighborhood Development: Offers guidance on how to achieve the Preferred Locations credit by meeting affordability thresholds (USGBC, LEED Reference Guide for Neighborhood Development).
質問 # 37
What information is required to determine if a project quality for the Green Infrastructure and Buildings Credit. Wastewater Management?
- A. Cost of installing wastewater system
- B. Rainwater reuse rate
- C. Average amount of annual wastewater generated
- D. Ability to connect to existing wastewater infrastructure
正解:C
解説:
To determine if a project qualifies for the Green Infrastructure and Buildings Credit related to Wastewater Management in LEED for Neighborhood Development (LEED-ND), the most relevant piece of information is theaverage amount of annual wastewater generatedby the project. This metric is essential because the credit focuses on minimizing the impact of wastewater on the environment, primarily through strategies such as reducing the volume of wastewater produced, treating wastewater on-site, and reusing treated wastewater.
* Wastewater Generation and Management:The LEED-ND rating system encourages the efficient management of wastewater to minimize its environmental impact. Specifically, the Green Infrastructure and Buildings Credit requires that a project demonstrates effective strategies for managing and reducing the volume of wastewater generated annually. This involves calculating the total averageamount of wastewater generated by the community and assessing how much of it can be treated and reused on-site.
* Credit Requirements:To earn the Wastewater Management credit, projects must typically show that they have reduced the amount of wastewater generated by at least 25% compared to baseline conditions or that they treat and reuse a significant portion of their wastewater on-site. This necessitates an accurate estimation of the average annual wastewater production to determine the appropriate strategies and technologies for meeting the credit's objectives.
* Supporting Strategies:Projects may employ various methods to achieve this, including installing efficient plumbing fixtures, recycling graywater, using natural treatment systems (like constructed wetlands), or connecting to high-efficiency municipal treatment facilities. However, all these strategies hinge on an understanding of the total wastewater volume generated, making this the most critical data point.
* The LEED Reference Guide for Neighborhood Development (LEED ND) provides comprehensive criteria and methodologies for calculating the average wastewater generation and determining credit eligibility.
* TheGreen Infrastructure and Buildingssection of the LEED v4 for Neighborhood Development rating system further outlines the specific requirements and point allocations for wastewater management strategies.
Detailed Explanation:References:For more detailed guidance and examples, refer to the LEED-ND Reference Guide available at the USGBC's resources section:
* LEED Reference Guide for Neighborhood Development
* LEED v4 Neighborhood Development
This detailed assessment is crucial in ensuring that a project can meet the sustainability goals required for LEED certification under the Green Infrastructure and Buildings Credit for Wastewater Management.
質問 # 38
A LEED forNeighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process.The protect team has secured an agreement withthe transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?
- A. One year
- B. Four years
- C. Three years
- D. Two years
正解:D
解説:
For a project that temporarily reroutes existing transit service as part of the construction process, the service can be rerouted for a maximum of two years and still qualify for the Smart Location and Linkage Credit:
Access to Quality Transit in LEED for Neighborhood Development.
* Access to Quality Transit Credit:This credit under the Smart Location and Linkage (SLL) category is intended to ensure that projects are located in areas with access to public transit. The credit promotes development near existing or planned transit services to reduce reliance on automobiles and lower greenhouse gas emissions.
* Temporary Rerouting:During construction, it may be necessary to temporarily reroute transit services.
LEED-ND allows this as long as the disruption is limited in duration. The maximum allowable period for rerouting transit services while still maintaining eligibility for this credit is two years.
* Restoration Requirement:The project team must secure an agreement with the transit agency to restore the original service routes after construction. This ensures that transit access is re-established, thereby maintaining the intent of the credit.
* The LEED Reference Guide for Neighborhood Development outlines the criteria for maintaining access to transit during construction and the conditions under which temporary rerouting is acceptable.
* TheLEED v4 Neighborhood Developmentdocumentation provides additional details on how to document and manage transit service changes during the construction phase.
Detailed Explanation:References:For more comprehensive guidance, refer to:
* LEED Reference Guide for Neighborhood Development
* LEED v4 Neighborhood Development
These explanations provide detailed insights into the requirements and conditions for achieving LEED-ND credits and adhering to Minimum Program Requirements.
質問 # 39
What agency is responsible for identifying prime and unique sods in agriculture and older associated industries?
- A. Department of Environmental Conservation or local equivalent
- B. Stale Natural Heritage Program or local equivalent
- C. Natural Resources Conservation Service or local equivalent
- D. American Farmland Trust or local equivalent
正解:C
解説:
The Natural Resources Conservation Service (NRCS), a division of the United States Department of Agriculture (USDA), is the agency responsible for identifying prime and unique soils in agriculture and other associated industries. Prime farmland is land that has the best combination of physical and chemical characteristics for producing food, feed, forage, fiber, and oilseed crops. The identification of such soils is crucial for ensuring that land development projects do not unnecessarily disturb valuable agricultural land.
LEED credits often require consultation with NRCS or its local equivalent to verify the presence of prime soils and to make informed decisions about land use.
References:
* LEED v4 for Neighborhood Development, Current Version
* LEED Reference Guide for Neighborhood Development
質問 # 40
Winch of the following are Included in the intent of Neighborhood Pattern and Design Credit. Local Food Production?
- A. Support walking and biking
- B. Decrease use of genetically modified organisms
- C. increase the variety of crop types in a region
- D. Improve nutrition
正解:A
解説:
The intent of the Neighborhood Pattern and Design Credit for Local Food Production under LEED for Neighborhood Development primarily focuses on enhancing community sustainability and promoting healthy living. Among the listed options, the inclusion of supporting walking and biking aligns with the goal of creating more walkable and bike-friendly environments, which is a key aspect of sustainable neighborhood design. This not only supports local food production by providing access to community gardens but also encourages healthier lifestyles by reducing reliance on cars and increasing physical activity through walking and biking.
質問 # 41
A developer is trying to calculate it a property qualities as an adjacent site. When considering the bordering land alongthe property boundary, which ofthe following borders can be omitted from the calculation?
- A. A wetland bordering the site
- B. A public street or other right-of-way
- C. A border along a lake
- D. A bordering site that Is previously disturbed
正解:B
解説:
When calculating whether a property qualifies as an adjacent site under LEED, certain borders can be omitted from the calculation. Specifically, a public street or other right-of-way can be omitted because these are considered infrastructure elements rather than natural or undeveloped land that would contribute to the adjacency calculation. This is in line with LEED's focus on encouraging developments that are connected to existing urban infrastructure while still promoting the preservation of natural spaces and minimizing the development of previously undeveloped land.
質問 # 42
Which location typewould earn the maximum points under the Smart Location and Linkage Credit. Preferred Locations Option 1: Location Type?
- A. An infill site that is also a previously developed site
- B. An infill site that is not a previously developed site
- C. An adjacent site that is also a previously developed site
- D. A previously developed site mat is not an adjacent site or infill site
正解:A
解説:
Under the Smart Location and Linkage Credit for Preferred Locations, maximum points are awarded to sites that are both infill and previously developed. This is because such sites typically have better access to existing infrastructure and services, reducing the environmental impact of development. Infill sites help limit urban sprawl, while previously developed sites contribute to the reuse and revitalization of land. Option B meets both criteria, hence earning the maximum points for this credit.
References:
* LEED v4 Neighborhood Development Guide: The guide discusses the criteria for Preferred Locations and the importance of infill and previously developed sites (USGBC, LEED v4 Neighborhood Development Current Version).
* LEED Reference Guide for Neighborhood Development: This guide explains the scoring system for the Preferred Locations credit and the benefits of using infill, previously developed sites (USGBC, LEED Reference Guide for Neighborhood Development).
質問 # 43
For a LEED for Neighbor Hood Development project, an important starting point for project certification Is the formulation of overarching goals to guide the project team's work toward successful certification The LEED for Neighborhood Development Reference Guide identities three foundations for goal setting, in addition to the project's environmental setting and community context, what is the third foundation?
- A. The projects timeline
- B. Federal policy
- C. The developer's mission
- D. USGBC's mission
正解:D
解説:
In LEED for Neighborhood Development, formulating overarching goals is essential for guiding the project team toward achieving successful certification. According to theLEED for Neighborhood Development Reference Guide, goal setting for a project is based on three foundational aspects: theproject's environmental setting, thecommunity context, and themission of the U.S. Green Building Council (USGBC).
* Option B: USGBC's missionis the correct answer because the mission of the USGBC-to promote sustainability in the built environment through cost-effective and energy-efficient building and neighborhood practices-serves as a guiding framework for all LEED projects. This mission helps ensure that the goals align with broader sustainability objectives, such as reducing environmental impact and enhancing the well-being of communities (Reference:LEED v4 ND Reference Guide).
* Option A: The project's timelineis not considered one of the three foundational elements for goal setting in LEED ND. While timelines are crucial for project management, they are not part of the foundational framework for establishing sustainability goals.
* Option C: Federal policymay influence project decisions, but it is not one of the core foundations for LEED goal setting.
* Option D: The developer's missioncan play a role in a project's direction, but it is not one of the three primary foundations outlined by LEED ND for goal setting.
Thus, the third foundational element for goal setting in LEED ND, along with environmental setting and community context, isUSGBC's mission, makingOption Bthe correct answer.
質問 # 44
What Is the existing or granted right to use property for specific types and quantities of land uses?
- A. Development Agreement
- B. Certificate of Occupancy
- C. Entitlement
- D. Building Permit
正解:C
解説:
Entitlement refers to the existing or granted right to use property for specific types and quantities of land uses.
It is a legal process that confirms a developer's rights to develop property in a specific way, in accordance with zoning and land-use regulations. Entitlement is an essential step in the development process, as it determines what can legally be built on a property and ensures that the proposed land uses align with local planning requirements. Building permits, development agreements, and certificates of occupancy are different stages of the construction and development process but do not provide the broad land-use rights that entitlements do.
質問 # 45
In a LEED for Neighborhood Development project, in order to earn one point for Innovation Credit. LEED Accredited Professional, the individual must have which accreditation?
- A. LEED AP Neighborhood Development
- B. LEED AP with any specialty credential
- C. LEED AP Building Design and Construction
- D. Any LEED AP without specialty credential
正解:A
解説:
To earn one point under theInnovation Credit: LEED Accredited Professional (AP)in a LEED for Neighborhood Development (ND) project, the individual must hold theLEED AP Neighborhood Development (LEED AP ND)credential. This credential signifies that the individual has specialized knowledge in the principles and processes specific to neighborhood development and sustainability, aligning directly with the requirements and intent of LEED ND.
* Option A: LEED AP Neighborhood Developmentis the correct answer because to earn this specific credit in a LEED ND project, the LEED AP must hold theNeighborhood Development (ND)specialty.
This ensures that the individual's expertise is aligned with the specific challenges and opportunities in neighborhood development, rather than other building-focused specialties (Reference:LEED v4 ND Reference Guide).
* Option B: LEED AP Building Design and Constructionwould not qualify for this credit in a LEED ND project, as it focuses on the building level rather than neighborhood-scale development.
* Option C: Any LEED AP without specialty credentialis not sufficient for the Innovation Credit.
LEED requires a specialty credential related to the specific project type (in this case, Neighborhood Development).
* Option D: LEED AP with any specialty credentialis also incorrect because LEED ND specifically requires theNeighborhood Developmentspecialty for this credit, not just any specialty.
Thus, the correct answer isA. LEED AP Neighborhood Development.
質問 # 46
A project team has achieved the require men is for Neighborhood Pattern and Design Credit. Community Outreach and Involvement. Option 1: Community Outreach. Which of the following additional actions would earn the project a total or two points?
- A. Conduct an Interactive workshop open to the public for at least two days
- B. Establish ongoing moans for communication between the developer and the community
- C. Modify Die projects conceptual design as a direct result of community input
- D. Obtain full entitlement and endorsements from the local land use and Building permitting jurisdictions
正解:B
解説:
To earn a total of two points under the Neighborhood Pattern and Design Credit for Community Outreach and Involvement, after achieving the requirements for Option 1: Community Outreach, a project team can establish ongoing means for communication between the developer and the community. This action demonstrates a long-term commitment to involving the community in the development process and ensuring that their concerns and input continue to be addressed as the project progresses.
* Community Outreach and Involvement Credit:This credit aims to ensure that the project is developed with input from the community, fostering transparency and collaboration between developers and residents. Achieving this credit not only helps in gaining community support but also improves the overall sustainability and livability of the project.
* Establishing Ongoing Communication:While the initial community outreach typically involves workshops or meetings to gather input during the preliminary design phase, establishing ongoing communication channels ensures that the community remains informed and engaged throughout the development process. This could include regular newsletters, dedicated websites, or community liaison officers.
* Benefits of Ongoing Communication:Continuous communication helps address any issues or concerns that may arise during construction or after the project is completed. It also allows the developer to update thecommunity on progress, gather feedback on any changes, and maintain a positive relationship with the neighborhood.
* The LEED Reference Guide for Neighborhood Development details the requirements for achieving points under the Community Outreach and Involvement credit, including the benefits of establishing ongoing communication.
* TheLEED v4 Neighborhood Developmentdocumentation provides further examples of effective community engagement strategies that contribute to long-term project success.
Detailed Explanation:References:For more information, refer to:
* LEED Reference Guide for Neighborhood Development
* LEED v4 Neighborhood Development
質問 # 47
What reference standard is used to determine compliance with Green Infrastructure and Buildings Prerequisite. Minimum Building Energy Performance when the whole building energy modeling option is used?
- A. ASHRAE 62.1-2010
- B. ASHRAE 90.1-2007
- C. ASHRAE 55-2010
- D. ASHRAE 90.1-2010
正解:D
解説:
When using the whole building energy modeling option to determine compliance with the Green Infrastructure and Buildings Prerequisite for Minimum Building Energy Performance, the reference standard used is ASHRAE 90.1-2010. This standard provides the minimum requirements for energy-efficient design of buildings, excluding low-rise residential buildings. It is a widely recognized benchmark for energy performance in the United States and is used as the basis for LEED energy modeling requirements.
質問 # 48
A project intends to connect to the municipal graywater system Toward which of the following can this connection contribute?
- A. Green Infrastructure and Buildings Prerequisite. Indoor Water Use Reduction
- B. Green Infrastructure and Buildings Credit. Rainwater Management
- C. Green Infrastructure and Buildings Credit. Outdoor Water Use Reduction
- D. Green Infrastructure and Buildings Credit. Wastewater Management
正解:D
解説:
Connecting to the municipal graywater system contributes toward the Green Infrastructure and Buildings Credit for Wastewater Management. This credit focuses on reducing the impact of wastewater generated by the project by encouraging the use of graywater systems for recycling and reusing water, thus minimizing the demand on municipal wastewater treatment facilities.
* Graywater Systems:Graywater refers to wastewater from domestic sources like sinks, showers, and laundry that can be recycled for non-potable uses such as irrigation or toilet flushing. By connecting to a municipal graywater system, the project can contribute to reducing the overall volume of wastewater that needs to be treated, thereby earning points under the Wastewater Management credit.
* Wastewater Management Credit:The intent of this credit is to minimize the adverse effects of wastewater on theenvironment. Projects can earn points by implementing strategies that reduce the volume of wastewater, treat it on-site, or connect to systems that facilitate its reuse.
* Benefits of Municipal Graywater Systems:Using a municipal graywater system helps in reducing the strain on local wastewater treatment facilities and promotes the sustainable use of water resources. It also aligns with LEED's broader goals of water conservation and efficient water use.
* The LEED Reference Guide for Neighborhood Development outlines the criteria for the Wastewater Management credit and how connecting to graywater systems can contribute to achieving it.
* TheLEED v4 Neighborhood Developmentdocumentation provides additional guidance on the types of wastewater systems that are eligible for this credit.
Detailed Explanation:References:For more details, consult:
* LEED Reference Guide for Neighborhood Development
* LEED v4 Neighborhood Development
質問 # 49
Which of the following can be included within the boundary of a project site on an urban waterfront?
- A. Marina pier in place prior to the date of property acquisition
- B. House boats in place prior to the issuance of certificate of occupancy
- C. Dock to be constructed by the developer
- D. Jetty with funding for construction prior to the date of certification
正解:C
解説:
When defining the boundary of a project site on an urban waterfront, a dock to be constructed by the developer can be included. This is because it is a planned and integral part of the project's development. Other options like houseboats, marinas, or jetties that were in place prior to the issuance of the certificate of occupancy or the date of property acquisition are generally not included in the project boundary as they were not part of the project's initial development plans. LEED requires that all project-related infrastructure, especially those constructed as part of the project, be included within the project boundary.
質問 # 50
A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?
- A. Two
- B. Five
- C. Three
- D. One
正解:D
解説:
For the Green Infrastructure and Buildings Credit on Transit Facilities, only bus stops that are operational by the time of project completion can be included in the credit documentation. In this scenario, since only one of the proposed bus stops will be in operation at the time of project completion, only this stop can be included in the application form. Stops that will become operational after project completion cannot be counted toward the credit.
References:
* LEED v4 Neighborhood Development Guide: This guide discusses the credit criteria for Transit Facilities, specifying that only currently operational or immediately operational stops can be included (USGBC, LEED v4 Neighborhood Development Current Version).
* LEED Reference Guide for Neighborhood Development: Offers specific instructions on documenting transit facilities, including the requirement that stops must be operational at project completion (USGBC, LEED Reference Guide for Neighborhood Development).
質問 # 51
Which of thefollowing can be Included as non-buildable land?
- A. Farmland
- B. Voluntarily set aside neighborhood park
- C. Drainage ponds
- D. Existing water Bodies
正解:D
解説:
Existing water bodies can be included as non-buildable land. Non-buildable land refers to areas where development is restricted due to natural features, environmental regulations, or other constraints that prevent construction. Existing water bodies, such as lakes, rivers, or ponds, naturally limit the possibility of development and are therefore classified as non-buildable. This designation helps protect natural resources and contributes to the sustainability and ecological health of the project site.
質問 # 52
......
合格させるUSGBC LEED-AP-ND試験最速合格にはPassTest:https://www.passtest.jp/USGBC/LEED-AP-ND-shiken.html
LEED-AP-ND試験問題(更新されたのは2024年)100%リアル問題解答:https://drive.google.com/open?id=1o8D0Tewt0wrNP63jIo6RzfWWYtNJNKfp