質問 # 46
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A. Setup time
- B. Pick/pack time
- C. Float before production
- D. Move Time
- E. Queue time
正解:A、D、E
解説:
A routing operation is a step in the production process that defines the work center, the duration, and the sequence of the operation. A routing operation consists of several time elements that are used to calculate the operation start and finish dates, as well as the capacity requirements. The time elements that are part of a routing operation are:
Move time: The time required to move the material from one work center to another, or from the storage location to the work center.
Setup time: The time required to prepare the work center for the operation, such as changing tools, adjusting machines, or cleaning the work area.
Processing time: The time required to perform the operation, such as machining, assembling, or testing the product.
Teardown time: The time required to restore the work center to its original state after the operation, such as removing tools, resetting machines, or disposing of waste.
Queue time: The time that the material waits at the work center before the operation starts, due to the work center being occupied by another operation or having a fixed start date.
The pick/pack time and the float before production are not part of a routing operation. The pick/pack time is the time required to pick the material from the storage location and pack it for delivery, which is usually part of the outbound logistics process. The float before production is the time buffer before the scheduled start date of the production order, which can be used to compensate for delays or changes in the production plan.
質問 # 47
What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
- A. A sales order is created.
- B. MRP creates a planned order.
- C. MRP creates a dependent requirement.
- D. A sales order is delivered.
正解:A
質問 # 48
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order generates capacity requirements
- B. The planned order's component availability is checked.
- C. The planned order's components are copied to the picking list.
- D. The planned order is converted to a production order.
正解:A
解説:
When you assign a planned order to a production line manually, using the planning table in repetitive manufacturing, the system generates capacity requirements for the planned order. The capacity requirements are calculated based on the production line, the quantity, and the production rate of the planned order. The system also checks the availability of the production line and displays any capacity overload or underload. The planned order is not converted to a production order, nor is the component availability or the picking list affected by the manual assignment. Reference: SAP Help Portal - Assigning Planned Orders to Production Lines, SAP S/4HANA Production Planning and Manufacturing Certification Guide - Chapter 7: Repetitive Manufacturing
質問 # 49
How are dependent requirements for assemblies created?
Note: There are 2 correct answers to this question.
- A. They are created together with the independent requirement for the finished product.
- B. They are only created for multilevel bill of material (BOM) structures.
- C. They are created with exact times in Advanced Planning.
- D. They are created on assembly level during the planning run.
正解:C、D
質問 # 50
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender Note: There are 2 correct answers to this question.
- A. Planned delivery time
- B. Inhouse production time
- C. Operation duration
- D. Total replenishment lead time
正解:A、B
質問 # 51
You want to use capacity availability checks for production orders.
Which settings have to be made for this?
Note: There are 2 correct answers to this question.
- A. The Relevant for Finite Scheduling indicator must be set.
- B. An overall profile must be assigned in the checking control.
- C. The scope of check must be defined in Customizing.
- D. A checking rule must be assigned to the work centers.
正解:A、B
質問 # 52
In your plant MRP is activated.
Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.
- A. Use a specific material group.
- B. Use a specific material status.
- C. Use a specific MRP list.
- D. Use a specific MRP type.
正解:B、D
質問 # 53
You are trying to create a production order and NO valid production version can be selected. What could be the reasons?
Note: There are 2 correct answers to this question.
- A. The order lot size is NOT within the validity range of a production version.
- B. All production versions for the material are locked.
- C. NO bills of material (BOMs) are assigned to the production versions.
- D. NO production lines are assigned to the production versions..
正解:A、C
解説:
A production version is a master data object that links a bill of material (BOM) and a routing or a production process model (PPM) for a material. A production version is required for creating a production order in SAP S/4HANA, as it determines the components, operations, and resources that are needed for producing the material. You can create a production version manually or automatically using the CS_BOM_PRODVER_MIGRATION02 report1.
If you are trying to create a production order and no valid production version can be selected, it could be because of the following reasons:
No bills of material (BOMs) are assigned to the production versions (A): A BOM is a master data object that defines the components and the quantities that are required for producing a material. A production version must have a valid BOM assigned to it, otherwise it cannot be used for creating a production order. You can assign a BOM to a production version on the MRP 4 tab page of the material master2.
The order lot size is not within the validity range of a production version (C): A production version has a validity range that defines the period and the lot size interval in which it can be used for production planning. The validity range is maintained on the MRP 4 tab page of the material master2. If the order lot size (the quantity of the material to be produced) is not within the lot size interval of any production version, then no valid production version can be selected for creating a production order.
The other options are not valid reasons for not being able to select a production version for creating a production order:
All production versions for the material are locked (B): A production version can have a status that indicates whether it is active or locked. A locked production version cannot be used for production planning, but it can still be selected for creating a production order. However, the system will issue a warning message that the production version is locked and ask for confirmation before proceeding with the order creation3.
No production lines are assigned to the production versions (D): A production line is an organizational unit that represents a group of resources that are used for producing a material. A production line can be assigned to a production version on the MRP 4 tab page of the material master2. However, this assignment is optional and not mandatory for creating a production order. A production line can be used for grouping production versions for reporting or analysis purposes, but it does not affect the selection of a production version for creating a production order4.
質問 # 54
Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Integrated Business Planning (IBP)
- B. Material Requirements Planning (MRP)
- C. Supply Chain Management (SCM)
- D. Capacity Requirements Planning (CRP)
正解:A、C
質問 # 55
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.
- A. Production order
- B. Purchase order
- C. Scheduling agreement schedule line
- D. Planned order
正解:C、D
質問 # 56
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.
- A. 100% check
- B. Simultaneous
- C. First in first out (FIFO)
- D. Manual maintenance
正解:A、D
質問 # 57
Why do you use Engineering Change Management? Note: There are 2 correct answers to this question.
- A. To monitor document object changes
- B. To enable integration into a sales order
- C. To save multiple changes for an object
- D. To monitor document table changes
正解:A、C
質問 # 58
You want to create a production order.
What methods can you use?
Note: There are 2 correct answers to this question.
- A. Convert a purchase requisition
- B. Create by order release
- C. Create in Kanban process
- D. Create without material
正解:C、D
質問 # 59
What options does a planner have in the planning table for repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Reschedule deallocate operations.
- B. Dispatch operations to work centers.
- C. Change the assignments of production quantities to production lines.
- D. Create new production quantities.
正解:A、C
質問 # 60
What are the options if the Dispatched operation status is set for a production order operation? Note:
There are 2 correct answers to this question.
- A. You can reschedule the operation using lead time scheduling.
- B. You can reschedule the operation using infinite scheduling in a planning table.
- C. You can reschedule the operation in the Manage Work Center Capacity app.
- D. You can reschedule the operation using finite scheduling in a planning table.
正解:C、D
質問 # 61
You have maintained the parameters for simple discontinuation in the material master of a component.
Which business process will be affected if the available stock is zero the discontinuation date is in the past?
- A. Material requirements planning
- B. Back flushing
- C. Production order release
- D. Kanban
正解:A
質問 # 62
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.
- A. Convert a purchase requisition
- B. Create in Kanban process
- C. Create by order release
- D. Create without material
正解:B、C
解説:
You can create a production order using the following methods:
Create by order release: You can create a production order by releasing a planned order in the material requirements planning (MRP) run. The system converts the planned order into a production order and assigns a production order number. You can use the Manage Production Orders app or the transaction CO40 to create production orders by order release.
Create in Kanban process: You can create a production order in the Kanban process, which is a lean manufacturing method that uses pull signals to trigger production. The system creates a production order when a Kanban status changes from EMPTY to WAITING. You can use the Kanban Board app or the transaction PK13N to create production orders in the Kanban process. Reference: SAP Help Portal, Manage Production Orders in SAP S/4HANA Manufacturing
質問 # 63
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA.
Note: there are 2 correct answers to this question.
- A. 100% check
- B. Simultaneous
- C. Manual maintenance
- D. First in First out (FIFO).
正解:A、C
解説:
Alternative item strategies are used to define how the system selects the alternative items in a BOM during the planning run or the order creation. The following alternative item strategies are available in SAP S/4HANA:
Manual maintenance: The system does not select any alternative item automatically. You have to manually select the alternative item in the BOM or the order. This strategy is useful when you want to have full control over the alternative item selection and when the selection depends on factors that are not known to the system1
100% check: The system checks the availability of all alternative items and selects the one with the highest priority and sufficient stock. If none of the alternative items has enough stock, the system selects the one with the highest priority and the smallest shortage quantity. This strategy is useful when you want to optimize the material availability and reduce the procurement costs2 First in First out (FIFO): The system selects the alternative item with the highest priority and the earliest availability date. If several alternative items have the same availability date, the system selects the one with the highest priority. This strategy is useful when you want to use the oldest stock first and avoid obsolescence3 Simultaneous: The system selects all alternative items simultaneously and distributes the requirement quantity among them according to the usage probability. The usage probability is a percentage value that indicates how often an alternative item is used. This strategy is useful when you want to balance the demand and supply of multiple alternative items and when the usage probability is known.
Reference:
Alternative Item Group - SAP Help Portal
Alternative Item Group - SAP Help Portal
Alternative Item Group - SAP Help Portal
[Alternative Item Group - SAP Help Portal]
質問 # 64
......