SAP C_TS422_2023 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Advanced Planning in SAP S
  • 4HANA: This section includes an overview of advanced planning fundamentals and master data. Explanation of key tools and processes. Discussion of planning evaluation concepts.
トピック 2
  • Process Orders in SAP S
  • 4HANA: This section covers an introduction to process order components, processing, and relevant master data objects. Overview of Good Manufacturing Practices (GMP) features.
トピック 3
  • Demand Management in SAP S
  • 4HANA: This section covers a comparison of production methods in various manufacturing environments.
トピック 4
  • Lean Manufacturing in SAP S
  • 4HANA: This section covers repetitive manufacturing master data, line load planning, and Kanban systems.
トピック 5
  • Managing Clean Core: This section covers the application of clean core principles to enhance business process agility, reduce adaptation efforts, and drive innovation in ERP systems.
トピック 6
  • Production Orders in SAP S
  • 4HANA: This section covers BOM item categorization, order status management, availability checks, routing selection, order type setup, and material handling processes.
トピック 7
  • Master Data in SAP S
  • 4HANA: This section covers the exploration of crucial production-related master data elements, with emphasis on bill of material, routing, and production version.

 

質問 # 43
Which information is required when you create a product master in SAP S/4HANA?
Note: There are 2 correct answers to this question.

  • A. Selection screen for plants
  • B. Selection screen for views
  • C. Base unit of measure
  • D. Product type

正解:C、D

解説:
When you create a product master in SAP S/4HANA, you need to enter values for mandatory fields such as product number, product type, base unit of measure, and description. The product type determines the category of the product, such as material, service, or article. The base unit of measure defines the unit in which you manage the product in all business transactions. The selection screen for views and plants are optional fields that allow you to choose which views and plants you want to maintain for the product master. Reference: Creating Products, Understanding the Concept of Master Data


質問 # 44
What are the key features of using a low level code?
Note: There are 2 correct answers to this question.

  • A. To determine the priority of alternative components inside ATP
  • B. To determine the use of subitems inside material BOM (bill of material)
  • C. To determine the sequence in which materials are planned in MRP
  • D. To determine how costs are rolled up by product costing

正解:C、D


質問 # 45
What can you use stard heuristics in Advanced Planning (PP/DS) for?

  • A. To optimize costs times in production plans
  • B. To solve planning problems for defined objects
  • C. To set default values in production master data
  • D. To automate material movements in material staging

正解:B


質問 # 46
Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question.

  • A. Material Requirements Planning (MRP)
  • B. Integrated Business Planning (IBP)
  • C. Supply Chain Management (SCM)
  • D. Capacity Requirements Planning (CRP)

正解:B、C


質問 # 47
What information do you have to maintain to define the relationship between supply source dem source in the Kanban process? Note: There are 2 correct answers to this question.

  • A. Production supply area
  • B. Replenishment strategy
  • C. Work Center
  • D. Routing

正解:A、B


質問 # 48
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

  • A. Planned orders (firmed)
  • B. ATP quantities
  • C. Planned orders (unfirmed)
  • D. Production orders

正解:A、D


質問 # 49
How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private Edition?
Note: There are 3 correct answers to this question.

  • A. Use stock transfer reservations for stock transfer.
  • B. Use purchasing costs for automated source prioritization.
  • C. Use run schedule quantities for inhouse production.
  • D. Use purchase orders for external procurement.
  • E. Use quotations for internal external procurement.

正解:A、C、D


質問 # 50
You want to reduce planning efforts for B C classified materials. Which planning procedure do you recommend?

  • A. Subassembly Planning
  • B. Advanced Planning
  • C. Consumption Based Planning
  • D. Material Requirements Planning

正解:C


質問 # 51
What is the purpose of a reporting point confirmation in repetitive manufacturing?
Note: There are 2 Correct answers to this question?

  • A. To stage different components for a production line simultaneously
  • B. To reduce the total production lead time for a long production line
  • C. To determine the work in progress along the production line
  • D. To provide timely updates of inventory management for the staged components

正解:C、D

解説:
A reporting point confirmation is a function that allows you to backflush the material components and activities that have been consumed and performed at a specific operation in a repetitive manufacturing process. It also reduces the dependent requirements for the planned orders. You can use reporting point confirmation for the following purposes:
To determine the work in progress (WIP) along the production line, by posting the quantity that is on the production line at each reporting point. This helps you to calculate the volume and value of unfinished products.
To provide timely updates of inventory management for the staged components, by recording the withdrawal of components at a time that is close to the time of the operation in which they are used. This helps you to avoid discrepancies between the actual and planned consumption of materials. Reference: Reporting Point Confirmation, Repetitive Manufacturing Confirmation


質問 # 52
You are trying to create a production order and NO valid production version can be selected. What could be the reasons?
Note: There are 2 correct answers to this question.

  • A. NO production lines are assigned to the production versions..
  • B. The order lot size is NOT within the validity range of a production version.
  • C. All production versions for the material are locked.
  • D. NO bills of material (BOMs) are assigned to the production versions.

正解:B、D

解説:
A production version is a master data object that links a bill of material (BOM) and a routing or a production process model (PPM) for a material. A production version is required for creating a production order in SAP S/4HANA, as it determines the components, operations, and resources that are needed for producing the material. You can create a production version manually or automatically using the CS_BOM_PRODVER_MIGRATION02 report1.
If you are trying to create a production order and no valid production version can be selected, it could be because of the following reasons:
No bills of material (BOMs) are assigned to the production versions (A): A BOM is a master data object that defines the components and the quantities that are required for producing a material. A production version must have a valid BOM assigned to it, otherwise it cannot be used for creating a production order. You can assign a BOM to a production version on the MRP 4 tab page of the material master2.
The order lot size is not within the validity range of a production version (C): A production version has a validity range that defines the period and the lot size interval in which it can be used for production planning. The validity range is maintained on the MRP 4 tab page of the material master2. If the order lot size (the quantity of the material to be produced) is not within the lot size interval of any production version, then no valid production version can be selected for creating a production order.
The other options are not valid reasons for not being able to select a production version for creating a production order:
All production versions for the material are locked (B): A production version can have a status that indicates whether it is active or locked. A locked production version cannot be used for production planning, but it can still be selected for creating a production order. However, the system will issue a warning message that the production version is locked and ask for confirmation before proceeding with the order creation3.
No production lines are assigned to the production versions (D): A production line is an organizational unit that represents a group of resources that are used for producing a material. A production line can be assigned to a production version on the MRP 4 tab page of the material master2. However, this assignment is optional and not mandatory for creating a production order. A production line can be used for grouping production versions for reporting or analysis purposes, but it does not affect the selection of a production version for creating a production order4.


質問 # 53
In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

  • A. MRP creates the capacity requirements without checking the work center capacities.
  • B. MRP creates the capacity requirements only if the work center has sufficient capacity.
  • C. MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.
  • D. MRP assigns the capacity requirements automatically after the last scheduled order on a work center.

正解:A

解説:
Infinite planning is a method of material requirements planning (MRP) that creates new orders without checking the capacity availability of the work centers. This means that the capacity requirements of a new order are created regardless of the existing capacity load or constraints of the work center. Infinite planning assumes that the required capacity can be increased or adjusted as needed. Infinite planning is suitable for situations where the capacity supply is flexible and the demand is urgent or unpredictable. However, infinite planning can also result in capacity overloads or unrealistic schedules that need to be resolved later by capacity leveling or rescheduling. Reference: SAP S/4HANA Production Planning and Manufacturing II, Unit 1: Material Requirements Planning; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 77.


質問 # 54
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

  • A. Requirements type
  • B. Order type
  • C. Planning strategy
  • D. Requirements profile

正解:A、C

解説:
The consumption of planned independent requirements by other requirements, such as sales orders or stock transport orders, depends on the planning strategy and the requirements type of the materials involved. The planning strategy defines the basic procedure for planning a material and determines whether the consumption is relevant for planning. The requirements type controls the consumption parameters, such as the consumption mode (forward, backward, or bidirectional), the consumption interval (period of time in which the consumption can take place), and the consumption indicator (whether the consumption reduces the planned independent requirements or not). Reference: Consumption of Planned Independent Requirements | SAP Help Portal, Planning Strategy | SAP Help Portal, Requirements Type | SAP Help Portal.


質問 # 55
What can you use heuristics in Advanced Planning (PP/DS) for?

  • A. To optimize costs and times in production plans
  • B. To solve planning problems for defined objects
  • C. To set default values in production master data
  • D. To automate material movements in material staging

正解:B

解説:
Heuristics are planning functions that execute planning for selected objects, such as products, resources, operations, or line networks, using a specific procedure. Heuristics are used in interactive planning, the SAP S/4HANA Digital Core MRP_live or in the Advanced Planning (PP/DS) production planning run. In the Advanced Planning, you can execute several heuristics, which belong to both production planning and detailed scheduling, for the same products in one planning run. Heuristics can help you to solve planning problems for defined objects, such as creating feasible production plans, scheduling operations, assigning resources, or leveling capacities. Heuristics can also consider various constraints and parameters, such as lead times, lot sizes, setup times, priorities, or alternative modes12.
Reference:
1: SAP Help Portal: Heuristics
2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 4: Advanced Planning


質問 # 56
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.

  • A. Create by order release
  • B. Create in Kanban process
  • C. Convert a purchase requisition
  • D. Create without material

正解:A、B

解説:
You can create a production order using the following methods:
Create by order release: You can create a production order by releasing a planned order in the material requirements planning (MRP) run. The system converts the planned order into a production order and assigns a production order number. You can use the Manage Production Orders app or the transaction CO40 to create production orders by order release.
Create in Kanban process: You can create a production order in the Kanban process, which is a lean manufacturing method that uses pull signals to trigger production. The system creates a production order when a Kanban status changes from EMPTY to WAITING. You can use the Kanban Board app or the transaction PK13N to create production orders in the Kanban process. Reference: SAP Help Portal, Manage Production Orders in SAP S/4HANA Manufacturing


質問 # 57
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Lot size
  • B. Manufacturing date
  • C. BOM component status
  • D. BOM header status

正解:A、B


質問 # 58
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

  • A. Assign the overall profile to the authorization profile.
  • B. Create an object selection variant for alerts according to the priority of ATP categories.
  • C. Assign the alert profile to the overall profile.
  • D. Create an object selection variant for productionplanningrelated alerts.

正解:C、D


質問 # 59
......