質問 # 23
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Determine a time period with available capacity on the planning board.
  • B. Reduce the planning time interval.
  • C. Execute an infinite production planning run for the critical resources.
  • D. Increase the capacity supply in a timephased interval.
  • E. Form optimum sequences to reduce setup times.

正解:A、D、E


質問 # 24
What will happen in the MRP run if you have created a new MRPrelevant material that supports both inhouse production external procurement?

  • A. The MRP run plans the material only if a quotation has been maintained.
  • B. The MRP run assumes inhouse production.
  • C. The MRP run assumes external procurement.
  • D. The MRP run does NOT consider the material; it has to be planned interactively.

正解:B


質問 # 25
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
Note: There are 2 correct answers to this question.

  • A. Production order
  • B. Purchase order
  • C. Planned order
  • D. Scheduling agreement schedule line

正解:C、D


質問 # 26
You are a consultant on an SAP S/4HANA Cloud Greenfield project.
Which of the following aspects should you focus on to achieve maintain clean core data quality? Note: There are 2 correct answers to this question.

  • A. Accuracy
  • B. Efficiency
  • C. Timeliness
  • D. Stability

正解:B、D


質問 # 27
What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

  • A. Alternative work centers are fully occupied.
  • B. The Change Planning Direction indicator is set in the strategy profile.
  • C. The work center has several individual capacities.
  • D. The Finite Scheduling indicator is NOT set in the strategy profile.

正解:C、D


質問 # 28
What could be the reason for different combinations of components in a multiple bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. BOM item status
  • B. BOM header status
  • C. Manufacturing date
  • D. Lot size

正解:C、D

解説:
A multiple bill of material (BOM) is a type of BOM that allows for different combinations of components or raw materials for the same assembly or subassembly. The reason for different combinations of components in a multiple BOM could be the manufacturing date or the lot size. The manufacturing date determines the validity period of the BOM, which means that different BOMs can be valid for different time intervals. For example, a BOM can be changed due to a design modification or a change in the availability of components. The lot size determines the quantity-dependent explosion of the BOM, which means that different BOMs can be used for different production quantities. For example, a BOM can be optimized for different batch sizes or different production methods. Reference: Multiple BOM, BOM Explosion


質問 # 29
Which information is required when you create a product master in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.

  • A. Base unit of measure
  • B. Selection screen for views
  • C. Industry sector
  • D. Product type

正解:A、C


質問 # 30
How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private Edition? Note: There are 3 correct answers to this question.

  • A. Use purchase orders for external procurement.
  • B. Use purchasing costs for automated source prioritization.
  • C. Use run schedule quantities for inhouse production.
  • D. Use stock transfer reservations for stock transfer.
  • E. Use quotations for internal external procurement.

正解:A、C、D


質問 # 31
How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.

  • A. Define the special procurement type inside the material BOM (bill of material).
  • B. Use a special item category in your material BOM (bill of material).
  • C. Select a special procurement type inside the material master.
  • D. Select a special MRP type inside the material master.

正解:A、C


質問 # 32
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.

  • A. Resource matrix
  • B. Resource network
  • C. Resource selection
  • D. Resource hierarchy

正解:B、C

解説:
A resource network is a business object in PP/DS that defines the allowed directed connections between two or more resources. A directed connection means that the connection from Resource 1 to Resource 2 is not the same as the inverse connection from Resource 2 to Resource 1. You use this object to model existing production constraints more precisely, with the objective of creating a finite and technically feasible production schedule. Resource networks simplify the modeling of resource restrictions for consecutive operations or orders1 A resource selection is a business object in PP/DS that defines the criteria for selecting a suitable resource for an operation or an order. You use this object to specify the characteristics, attributes, and capacities of the resources that can be used for a particular production process. Resource selection allows you to optimize the resource utilization and reduce the setup times and costs2 A resource matrix is a business object in PP/DS that defines the relationships between different resources based on their characteristics and attributes. You use this object to determine the setup times and costs for changing from one resource to another. Resource matrix allows you to model the setup effort and expense more accurately and improve the production efficiency3 A resource hierarchy is a business object in PP/DS that defines the structure and sequence of resources that are used for a production process. You use this object to represent the logical and physical dependencies of the resources and to control the scheduling and sequencing of the operations or orders. Resource hierarchy allows you to model the production flow and capacity more realistically and ensure the technical feasibility of the production plan.
Reference:
Resource Network | SAP Help Portal
Resource Selection | SAP Help Portal
Resource Matrix | SAP Help Portal
[Resource Hierarchy | SAP Help Portal]


質問 # 33
Where do you maintain the work center that represents the production line for repetitive manufacturing?
Note: There are 2 correct answers to this question

  • A. Production cost collector
  • B. Routing
  • C. Repetitive manufacturing profile
  • D. Production version

正解:C、D

解説:
The work center that represents the production line for repetitive manufacturing is maintained in two places: the repetitive manufacturing profile and the production version. The repetitive manufacturing profile is a control parameter that defines the basic settings for repetitive manufacturing, such as the planning type, the backflushing method, the confirmation type, and the production line determination. The production version is a combination of a bill of material (BOM) and a routing or a rate routing that specifies how a material is produced. The production version also contains the work center that represents the production line for the material. The production version is assigned to the material master and is used in the planning and execution of repetitive manufacturing. Reference: Repetitive Manufacturing Profile | SAP Help Portal, Production Version | SAP Help Portal, Make-to-Stock Repetitive Manufacturing | SAP Help Portal.


質問 # 34
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. BOM component status
  • B. BOM header status
  • C. Manufacturing date
  • D. Lot size

正解:C、D


質問 # 35
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with more than one work center
  • B. A production line with a parallel sequence in the routing
  • C. A production line with an alternative sequence in the routing
  • D. A production line with prioritized alternative work centers

正解:A


質問 # 36
Where do you maintain data to determine the duration of an operation for production? Note: There are
2 correct answers to this question.

  • A. Production version
  • B. Material master
  • C. Routing
  • D. Work center

正解:C、D


質問 # 37
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do?
Note: There are 2 correct answers to this question.

  • A. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • B. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
  • C. Add the agreement to the quota arrangement mark it for MRP relevance.
  • D. Add the agreement to the source list mark it for MRP relevance.

正解:A、D


質問 # 38
How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question.

  • A. Digital signature
  • B. Batch record
  • C. GMPcompliant flag
  • D. Recipe approval
  • E. Approved resources

正解:A、B、D


質問 # 39
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.

  • A. Create in Kanban process
  • B. Create without material
  • C. Convert a purchase requisition
  • D. Create by order release

正解:A、D

解説:
You can create a production order using the following methods:
Create by order release: You can create a production order by releasing a planned order in the material requirements planning (MRP) run. The system converts the planned order into a production order and assigns a production order number. You can use the Manage Production Orders app or the transaction CO40 to create production orders by order release.
Create in Kanban process: You can create a production order in the Kanban process, which is a lean manufacturing method that uses pull signals to trigger production. The system creates a production order when a Kanban status changes from EMPTY to WAITING. You can use the Kanban Board app or the transaction PK13N to create production orders in the Kanban process. Reference: SAP Help Portal, Manage Production Orders in SAP S/4HANA Manufacturing


質問 # 40
Under what circumstances can you change the material type for a material if stocks reservations or purchasing documents exist? Note: There are 2 correct answers to this question.

  • A. The same base unit of measure is used.
  • B. The quantity value updates are the same.
  • C. The same account category is used.
  • D. The same batch management level is used.

正解:B、C


質問 # 41
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
  • B. An evaluation to verify if there are material or capacity shortages in the ^ network after the production planning run
  • C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
  • D. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements

正解:C

解説:
Pegging is a term used in Advanced Planning to describe the relationship between the receipt and the issue elements of a product within a location. Receipt elements are planning elements that increase the stock of a product, such as production orders, purchase orders, or stock transfers. Issue elements are planning elements that reduce the stock of a product, such as sales orders, planned independent requirements, or reservations. Pegging links the receipt and issue elements according to the bill-of-material structure of all related products and represents the material flow through all levels of production. Pegging enables the system to identify and display quantity and date/time problems, such as shortages or delays, and to forward scheduling changes to other dependent elements. Pegging also forms the basis for the availability check and the capacity check in Advanced Planning12.
Reference:
1: SAP Help Portal: Pegging
2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 4: Advanced Planning