質問 # 79
An organization is in the process of replacing its current system. The business analyst is charged with ensuring that all current connections to other systems remain functional after the upgrade.
What analysis should the business analyst conduct to facilitate a successful migration?
- A. Interface
- B. User interface
- C. Document
- D. Systems
正解:D
解説:
Explanation/Reference:
質問 # 80
Last year, a company registered a high number of complaints about its customer service. Which of the following tools or lechniques can help to identify the high-priority changes needed to improve that service?
- A. A flowchart of the service
- B. A work breakdown structure analysis of the service
- C. A cause-and-effect diagram
- D. A Pareto analysis
正解:D
質問 # 81
Once a new project has been identified, the business analyst works with project team members to define what will be included in and excluded from the new system. Which of the following has the business analyst defined?
- A. Solution scope
- B. Solution design
- C. Business case
- D. Business requirements
正解:A
質問 # 82
What should be done lo ensure that the product design meets the stated requirements?
- A. Use a traceability matrix.
- B. Review lessons learned results.
- C. Conduct multiple internal design reviews.
- D. Engage an experienced development team.
正解:C
質問 # 83
A business analyst is attempting to elicit requirements on a current project. The business subject matter experts (SMEs) from various departments in the company question how the solution will work with their various systems.
Which modeling technique should the business analyst use to depict how the solution will work with all of the company's systems?
- A. Enterprise modeling
- B. Rules modeling
- C. Interface modeling
- D. Data modeling
正解:D
質問 # 84
A business analyst conducts an initial review to define scope. The analysis includes the review of the business case, project goals, and objectives to obtain the necessary and required context. Based on that information, the business analyst determines that this is a large project with multiple interfaces which could cost the company money that was not initially included in the budget.
What characteristics of the project are needed to determine the approach so that the business analyst can validate whether they will need to have a discussion about the budget?
- A. Decision on the type of models to be used
- B. Type of elicitation activities to be conducted
- C. Selected project life cycle
- D. Business analysis deliverables to be produced
正解:D
質問 # 85
The business analyst is conducting a feasibility study to understand how well a potential solution fits into the organization. What kind of feasibility assessment is the business analyst undertaking?
- A. Technical
- B. Time
- C. Cost-effectiveness
- D. Operational
正解:D
解説:
Explanation/Reference: https://www.simplilearn.com/feasibility-study-article
質問 # 86
A business analyst is working on a highly complex project and has elicited a large number of requirements from stakeholders in several departments Due to the large number of requirements, the stakeholders have determined that they would like to prioritize them to minimize a potentially large scope.
Which technique could the business analyst use to manage requirements?
- A. MoSCoW
- B. SMART goals
- C. RACI models
- D. Storyboarding
正解:A
質問 # 87
Company A has set aside capital to invest in an upgrade to their scheduling system Documentation of the current structure was presented to the business analyst However, the description of certain steps are not documented clearly, and the business analyst has not been allowed to inspect the existing system. During elicitation. the business analyst asked questions of the schedulers as they performed functions in order to gain an understanding of the process.
Which type of elicitation technique did the business analyst use in this instance?
- A. Participatory observation
- B. Simulation
- C. Active observation
- D. Interview
正解:C
質問 # 88
After analyzing a set of requirements documents, it is determined that the requirements are not yet ready for peer review. This was most likely caused by:
- A. the requirements not providing all of the information needed to define the work.
- B. some requirements having not yet been discussed in a work group session.
- C. the requirements' reference codes not tracing to the attribute numbers in the work breakdown structure.
- D. the requirements documents having not yet received sign-off from the sponsor.
正解:C
質問 # 89
The document that defines the process for managing requirements revisions is the:
- A. change management plan.
- B. project management plan.
- C. communications management plan.
- D. scope management plan.
正解:A
質問 # 90
A business analyst has been assigned to a project that will design and build two new bridges and. at the same time, redesign a failing bridge for a local structural engineering company. All three bridges must be constructed and meet all safety requirements before flood season next spring.
How would the business analyst define the scope of this project?
- A. Perform a feasibility study.
- B. Perform process modeling.
- C. Perform a structured walkthrough.
- D. Perform a work breakdown structure.
正解:D
質問 # 91
A business analyst is preparing a requirements management plan and needs to define a method to deal with a complex project with stakeholders who find it difficult to articulate their needs. Which method would best minimize requirements risk?
- A. Questionnaires
- B. Stakeholder analysis
- C. Group decision making
- D. Prototyping
正解:A
質問 # 92
A company has completed a major project within time, cost, and scope and satisfied high-level quality standards and marketing requests. However, the product was considered a complete failure by shareholders and the market due to low return on investment.
From the business analysis perspective, the main reason for this business failure was a failure to:
- A. review and evaluate market expectations.
- B. establish measurable success criteria in the business case.
- C. set the product positioning.
- D. gather the appropriate usability requirements.
正解:A
質問 # 93
After reviewing a business case, project goals, and objectives, a business analyst determines that the organization prefers taking an exploratory approach to finding the solution that best meets the business need.
Which approach best aligns with the business need for this organization?
- A. Change-driven approach
- B. Waterfall approach
- C. Plan-driven approach
- D. Analytical approach
正解:A
解説:
Explanation/Reference: https://www.slideshare.net/carlitos5071989/babok-v20
質問 # 94
A business analyst is trying to determine which analysis technique will be best suited to elicit information from a large number of users in a short period of time. Which elicitation technique is best suited for this purpose?
- A. Ongoing observation
- B. Facilitated workshop
- C. Questionnaire
- D. Group brainstorming
正解:B
質問 # 95
The business analysts have concluded a requirements elicitation workshop. They now need to define rationale for each requirement. Which of the following pairs of items would be important to include in the rationale?
- A. Stakeholder impact and design decisions
- B. Functional relationships and work breakdown structure code
- C. Product vision and operational relationships
- D. Reasons and assumptions
正解:D
質問 # 96
A system enhancement project has been initiated to address the concerns of an external group of stakeholders not included in the first release. What should be done to ensure stakeholder satisfaction with the enhancement?
- A. Request that the project manager identify all affected project stakeholders.
- B. Provide all signed-off project documentation to the stakeholders for information purposes only.
- C. Solicit feedback and add requirements to the project backlog.
- D. Engage all stakeholders early in the requirements gathering phase to define acceptance criteria.
正解:D
質問 # 97
......
PMI-PBA認定試験は、4時間で完了する必要がある200個の多肢選択問題から構成されています。試験は、ニーズアセスメント、計画、分析、トレーサビリティとモニタリング、評価の5つのドメインをカバーしています。質問は、ビジネス分析ツールや技術、要件管理、ステークホルダーの関与、コミュニケーションの知識をテストするよう設計されています。PMI-PBA認定は、キャリアを進め、この分野での専門知識を証明したいビジネスアナリストにとって貴重な資格です。
PMI PMI-PBA 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
| トピック 6 |
|
| トピック 7 |
|
PMI PMI-PBA 認定試験は、ビジネス分析分野の専門家にとって貴重な資格です。この試験は、ビジネス分析の様々な分野における専門家のスキルと知識を検証するために設計され、雇用主や業界専門家から世界的に認められています。この認定試験は、PMIによって実施され、要件分析、ステークホルダーの関与、引き出し、ソリューションの評価など、幅広いトピックをカバーしています。試験に合格した候補者は、ビジネス分析における熟練度を証明し、仕事市場で差別化することができます。